Installations

Stanley Carter Technology Inc. is a Mechanical Contractor engaged in industrial construction. Some of the key areas of installation and construction are:
 
 

Power Plants

An important step towards self-sufficiency in the 90's, Co-Generation allows a business to satisfy its own electrical needs without outside energy dependency. Stanley Carter Technology Inc. installs this Co-Generation Power Plant technology as well as that associated with more typical powerhouse facilities. Our personnel position the equipment and high-pressure piping required in the production of power plant-generated electrical energy. We can provide installation service for both Built-Up and Package Boilers. This includes installation of ASME code piping and other related equipment by our certified welders.
 
 

Plumbing 

In addition to providing the piping required to complete a particular installation, Stanley Carter Technology Inc. also assumes on-the-job responsibility for plumbing, heating and air conditioning system requirements as well. From HVAC units to sanitary facilities, we utilize the latest in piping materials to provide your workers with the environmental and human comforts conducive to good morale and high productivity.
 
 

Environmental Test Rooms 

Engine Cooling Test Stands.JPG (55808 bytes)Advances in testing technology mean automakers no longer need depend solely upon satellite field units in such places as MesaArizona or BemidjiMinnesota for extreme-weather vehicle testing. Designers are now creating blueprints for Environmental Rooms that can simulate winter or hot-weather conditions in-house.

And often, it's Stanley Carter Technology Inc. people who are called   upon to provide the piping expertise needed to install these sophisticated facilities. We fulfill the refrigeration and heating component installation required to create testing temperatures that range from minus 65 degrees F to plus 300 degrees F.
 
 

Wind Tunnels 

Federally-mandated automotive requirements are constantly changing, requiring the development and installation of the most modern vehicle testing equipment. Among these, the Climatic Wind Tunnel. Stanley Carter Technology Inc. offers the experience that system designers are looking for when it comes to their installations.

Our personnel are proficient in the use of the appropriate piping materials and equipment so important to the transport of sub-zero brine systems. From refrigeration unit placement, to pipe, valves, fittings, and coil hookup, we provide our client with the hardware and expertise needed to properly simulate winter-like testing conditions.
 
 

Dynamometer Facilities 

Stanley Carter Technology Inc. installs the complex systems required to control dynamometer test facilities for major automakers throughout the country. Each Test Room is designed to simulate road and load conditions for engines and transmissions in order to observe such variables as fuel consumption, emissions control, cooling and shifting.

Each set of tests calls for the supply or exhaust of gasoline, water, steam air or emitted gases to or from the test area. All required service piping and specialty components are installed by Stanley Carter Technology Inc. personnel.

Shop Fabrication 

MACHINE.JPG (38873 bytes)An additional service that Stanley Carter Technology Inc. provides for clients is the ability to fabricate and design piping components in-house for jobsite installation. Prefabrication ensures accurate production and timely installations of piping systems.

Our skilled welders and pipe fitters are capable of fabricating pipe of all sizes and types. From sophisticated materials such as high-pressure, high-temperature piping required by co-generation systems, to the varied materials demanded by waste treatment, our personnel can provide the prefabricated piping needed to satisfy all requirements.

Home